Flow Process- Die & Mould
| Sr. No. | Particular | Sequence of Activity |
| 1 | Quote to customer of his Inquiry as per his requirement | Quotation |
| 2 | Drawing, Sample and order with Schedule are Received from Customer | Order / Planning |
| 3 | Job card release/Whole Designing And detail designing and preparing parts drawing | Design / Release |
| 4 | Order to vendor for raw material requirement or order to customer for arrange | Raw Material Order |
| 5 | Received Raw Material (casting or bar or block) from customer / outside vender source | Raw Material Inward |
| 6 | Checked raw goods and if require prepare pre-machining drawing | Inspection |
| 7 | Send it to vendor or inhouse convensional shop for pre-machining/part making with drawing | Pre-machining (Conventional Shop) |
| 8 | Received it to VMC/CNC shop and checked pre-machining dimension | CNC Shop / Inspection |
| 9 | Prepare Programme and inspection report with set up sheet and clamping | Programming/Setting |
| 10 | Inspect durring machining after each programme | In-process Inspection |
| 11 | After completed VMC/CNC process send it for final inspection | Inspection |
| 12 | Send it to Convensional shop for Assembly (all part from VMC and conventional and readymade) | Assembly |
| 13 | After Assembly completed polished goods | Polishing |
| 14 | After polishing and Assembly inspect all throughly | Inspection |
| 15 | If require, trial all Assembly | Trial |
| 16 | Packing in boxes for dispatch | Packing |
| 17 | Dispatch with require Document | Dispatch |
Flow Process-Machinery Components
| Sr. No. | Particular | Sequence of Activity |
| 1 | Quote to customer of his Inquiry as per his Requirement | Quotation |
| 2 | Drawing, Sample and order with Schedule are Received from Customer | Order / Planning |
| 3 | Received Raw Material (casting or bar or block) from customer / outside vender source | Raw Material Inward |
| 4 | Prepare Job card & Checked raw goods and if require prepare pre-machining drawing | Schedule / Designing |
| 5 | Send it to vendor or inhouse convensional shop for pre-machining with drawing | Pre-Machining (Conventional Shop) |
| 6 | Received it to CNC shop and checked pre-machining dimension | Ready for CNC shop/Inspection |
| 7 | Prepare Programme and inspection report for production as per job card | Programming/Setting |
| 8 | First piece checked throughly after trial and before start production | Trial/Inspection |
| 9 | After completed CNC process send it for final inspection | Inspection |
| 10 | Send it to VMC shop (Vendor) if its require | VMC/Milling process |
| 11 | After VMC completed deburred(polished) goods send it for hole and tapping | Hole/Tapping |
| 12 | Hole And Tapping Done By Using Jigs And Fixture As Per Require Quality | Hole/Tapping |
| 13 | After Finished All Operation, Polished And Cleaning And Deburred All Components | Polishing/Cleaning |
| 14 | Final Inspection Report Fill Up And Checked | Final Inspection |
| 15 | Packing In Boxes For Dispatch | Packing |
| 16 | Dispatch with require Document | Dispatch |
Contact Us
Shreeji Enterprise
Rani Industrial Estate 2, 8B, Vavdi, Rajkot, Gujarat - 360004, India
Call Us : View Mobile Number
E-mail : srj.chirag@yahoo.com
Hi! Simply click below and type your query.
Our experts will reply you very soon.